On Saturday 18 August we put a little more work into the doubleslip that we're rebuilding from a kit of parts. In the above, Colin, Peter and John were drilling holes for a checkrail at the Kaitoke end of the slip, the checkrail and running rail having originated from a turnout purchased from KiwiRail at Taita.
The outer slip rail on the KiwiRail side needed further attention to ensure a good fit to the switch. There was some residual curvature that needed to be crowed out - a 40 minute job...
Once the doubleslip is completed we will build another turnout - connecting the doubleslip with the completed road 1 turnout and the two tracks leading into the rail vehicle shed.