Carriage Aa1060 shifted in road 1 reshuffle
Road 1 in our rail vehicle shed received our attention on Saturday 11 May. Track was connected to the short length of temporary track that wooden sleeping carriage Aa1060 was stored on.
Road 1 in our rail vehicle shed received our attention on Saturday 11 May. Track was connected to the short length of temporary track that wooden sleeping carriage Aa1060 was stored on.
DBR1267 hauls special train F44, including Cyclops, three IAB wagons and trailing DBR1200 across Silverstream bridge on its way to Maymorn on Sunday 21 April 2013.
After weeks of planning 'Cyclops' - the sole remaining 3-car English Electric multiple unit set - arrived at the Trust's Maymorn station on Sunday 21 April.
DM556 and its two associated trailer cars will arrive at Maymorn by rail at approximately 11:00am Sunday 21 April 2013. Trust members and the public are welcome to visit the site t
A long-awaited milestone - the first workshop portal frames lifted into position on Saturday 13 April 2013.
Another fabulous Autumn day at Maymorn, no sign of the dry, warm weather breaking any time soon - as can be seen in the photo of our shunting locomotive Tr189 inside rail vehicle shed.
Commissioning work has now been completed on our Hillside Workshops-built shunting locomotive Tr189. Photographs from the second day of commissioning tests - 9 March 2013 follow.
On Saturday 16 February 2013 the frames of steam locomotive Wb 299 were moved inside the rail vehicle shed at Maymorn. This was made possible by track work completed earlier in the day.
We have been working on connecting our mainline to the shed yard, including a double slip and two turnouts, all in 91LB/yard rail.